Structural alterations to combine kitchen and dining room by removing a central load-bearing wall.
Steel beam sizing, padstone design, and temporary propping method statement for safe construction.
First floor bedroom above required careful assessment of existing floor construction.
Works completed safely following the issued propping sequence.