Project Hero Image
Overview
Structural alterations to combine kitchen and dining room by removing a central load-bearing wall.
Scope of Work
Steel beam sizing, padstone design, and temporary propping method statement for safe construction.
Constraints and Coordination
First floor bedroom above required careful assessment of existing floor construction.
Outcome
Works completed safely following the issued propping sequence.
Services Provided
- Drawings and Calculations
- Temporary Works and Method Statements
Deliverables
- Calculation pack PDF
- Temporary propping method statement
- Construction sequence